Project Photo

IRAN AMIR KABIRSUPLY VESSELSVLLCC AND LNG YARD

NEKA INTEGRATED HARBORLAUNCHING & DOCKING FACILITES INTERNATIONAL MARINE TERMINAL

MAIN PRODUCTION HALLPARS KHODRO PAINT LINEPRESS SHOP

SHAHID MAHALLATI SHIPYARDI.O.O.C. HARBOUR EXTENSIONDOROOD FIELD ONSHORE CLUSTERS

WATER INTAKE PROJECTFIBER GLASS PASSENGER CRAFTARVANDAN SHIPYARD

Drilling Operation Support BaseMahboobLlian Building and Repair YardMaster Plan Of Persian Gulf Network

 

Iran Amir Kabir ( Ex. Iran Alborz )SUBMERSIBLE DRILLING UNITPROJECT (IAKSSDU)U

                 

Project Particulars

Name of Project

:

Iran Amir Kabir ( Ex. Iran Alborz )SUBMERSIBLE DRILLING UNITPROJECT (IAKSSDU)

Employer

:

NIOC – KEPCO

Contractor

:

SADRA-GVA C Consortium

Location of implementation

:

Neka – Sadra Shipyard

Delivery date

:

2009

Cost

:

302 Million USD

 

 

      Main Dimension

          Length over all                                           98.60 m

          Breadth over all (less bolsters)               78.80 m

          Height, keel to upper deck                       36.50 m

          Height, to lower deck                                29.70 m

          Height, keel to bottom of top box           28.50 m

Pontoons

          Length over all                                       80.56 m

          Breadth over all                                     18.68 m

          Depth                                                      7.50 m

Columns

 Circular columns                                 12.90 m diameter

 

   

            Scope of work of APS for Supervision to EPC Contract

 

Supervision to Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision.

ü

ü

ü

ü

ü

ü

2

          

 Project Particulars

Name of Project

:

Three Multi Purpose Supply Vessels Project

Employer

:

NIOC - KEPCO

Contractor

:

SADRA

Location of implementation

:

Neka – Sadra Shipyard

Delivery date

:

2008

Cost

:

About 70 Million USD

 Principal Particulars:

Length Over All

:

74.40m

Length Betw. Perp

:

66.48m

Breadth Mld.

:

16.00m

Depth To 1st deck

:

7.60m

Scantling Draught

:

6.84m

Frame Spacing

:

0.60/0.72/0.60m

Bollard Pull

:

180 tonnes

     Scope of work of APS for Supervision to EPC Contract

 

Supervision to Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision.

ü

ü

ü

ü

ü

ü

3

Project Particulars

Name of Project

:

New Building and  Repair Yard Project

Employer

:

Iran Ship Building & Offshore Industries Complex (ISOICO)

Contractor

:

Various Iranian & INT. Companies

Location of implementation

:

BANDAR - ABBAS

Delivery date

:

2010

Cost

:

First Phase about 473 million USD, total about 700  million USD (Estimated)

 

Scope of work of APS for Engineering Services rendered for the Project

 

Eng.

Supervision to Execution

Mother consultant

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

ü

top

 

4

                  NEKA INTEGRATED HARBOR EXTENSION PROJECT

 

                   

 Project Particulars

 

Name of Project

:

Neka Integrated Harbor Breakwater & Dredging

Employer

:

NIOC

Contractor

:

To be tendered

Location of implementation

:

Neka

Delivery date

:

2012

Cost

:

125 million USD (Estimated)

 

 

 

 

 

 

 

 

 

 

 

Scope of work of APS for Supervision to EPC Contract

Supervision to Eng.

Supervision to Execution

Concep.Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

ü

ü

ü

 

 

 

 

5

  

Project Particulars

Name of Project

:

Launching & Docking Facilities at Arvandan Shipyard

Employer

:

Arvandan Ship Building Company

Contractor

:

Azar-Simab

Location of implementation

:

Khoramshahr

Delivery date

:

2008

Cost

:

10 million USD

 

 

 

 

 

 

 

 

 

 

 

Principal Particulars

Length (Basin)

:

76.30m

Width (Basin)

:

40.00m

Launching Basin Dept.

:

3.60m

Stilling Basin Dept.

:

6.50m

Length (Design Ship)

:

60.00m

Wight (Design Ship)

:

13.00m

Light Weight (Design Ship)

:

470 ton

 

Scope of work of APS for Lunching & Docking Facilities

 

Eng.

Supervision to Execution

Concep.Des

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

ü

 

 6

       

Project Particulars

Name of Project

:

International Marine Terminal

Employer

:

Port and Shipping Organization (PSO)

Contractor

:

Toseeh Maskan Organization  

Location of implementation

:

Bandar Abbas

Delivery date

:

1996

Cost

:

6 million USD

 

    Scope of work of APS for International Marin Terminal

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

ü

 

7

 

Project Particulars

Name of Project

:

Gama Khodro Main Production Hall & Underneath Gear-Box assembly Hall

Employer

:

Pars Khodro

Contractor

:

Alout Company

Location of implementation

:

Tehran

Delivery date

:

1999

Covered Area

:

36500 m²

 

   

 Scope of work of APS for Gama Khodro Main Production Hall

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

ü

8

Project Particulars

Name of Project

:

Full Automatic Paint Line with PLC Control System

Employer

:

Pars Khodro

Contractor

:

Asad Sanaat

Location of implementation

:

Tehran

Delivery date

:

1998

  

  Scope of work of APS for Paint Line With PLC Controlling System

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

ü

9

 

Project Particulars:

Name of Project

:

Press Shop (Two Lines of Presses for Forming the Hull of Automobile)

Employer

:

Pars Khodro

Contractor

:

Maskan va Navahi Sanati

Location of implementation

:

Tehran

Delivery date

:

2000

   

Scope of work of APS for Press Shop

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

ü

110

     

                     

BUSHEHR SHAHID MAHALLATI SHIPYARD

 

 

 

 

Project Particulars

Name of Project

:

Mahallati Shipyard

Employer

:

Sepah Navy (NEDSA)

Contractor

:

Omran Sahel

Location of implementation

:

Bushehr

Delivery date

:

1998

Cost

:

50 Million USD

   

Scope of work of APS for Mahalati Shipyard

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

ü

11

Project Particulars

Name of Project

:

I.O.O.C. Extension Project

Employer

:

Elf Petroleum Iran

Contractor

:

Tide Water

Location of implementation

:

Kharg Island

Delivery date

:

2000

Cost

:

5 Million USD (Estimated)

 

     Scope of work of APS for L.O.O.C. Extension Project

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

12

Project Particulars

Name of Project

:

Dorood Project

Employer

:

Elf  Petroleum Iran

Contractor

:

Alisaz Construction Company

Location of implementation

:

Kharg Island

Delivery date

:

2001

Cost

:

 

 

 

 

 Scope of work of APS for Dorood Project

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

ü

13

Project Particulars

Name of Project

:

Water Intake

Employer

:

Total Fina Elf

Contractor

:

Ali Saz

Location of implementation

:

Kharg Island

Delivery date

:

2003

Cost

:

4 Million  USD

 

Scope of work of APS for Water Intake

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

 

ü

ü

 

ü

ü

 

 

14

Project Particulars

Name of Project

:

Fiberglass Passenger Craft

Employer

:

Kerman Khodro

Contractor

:

Kerman Khodro Fiberglass industries Co.

Location of implementation

:

Kerman

Delivery date

:

2000

Cost

:

 

 

  

Principal Particulars:

Length Overal

:

23.0m

LBP

:

21.0m

Displacement Full

:

54.6 tonnes

     Scope of work of APS for Fiberglass Passenger Craft

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

 

 

 

15

              ARVANDAN SHIPYARD AND REPAIR COMPLEX IN ABADAN

   

Project Particulars

Name of Project

:

Arvandan Shipbuilding and Repair Complex in Abadan

Employer

:

Arvandan Ship Building Company

Contractor

:

 

Location of implementation

:

Abadan

Delivery date

:

 

Cost

:

About 50 million USD (Estimated)

 

 

 

 

 

 

 

 

 

 

 

Scope of work of APS for Engineering Services rendered for the Project

 

Eng.

Supervision to Execution

Concep. Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

 

 

 

 

 

 

16

                                Drilling Operation Support Base

 Project Particulars

 

Name of Project

:

Drilling Operation Support Base

Employer

:

KEPCO.

Contractor

:

PANAH SAZ

Location of implementation

:

Neka

Delivery date

:

2009

Cost

:

12 million USD (Estimated)

 

 

 

 

 

 

 

 

 

 

 

Scope of work of APS for Supervision to EPC Contract

 Eng.

Supervision to Execution

Concep.Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

ü

ü

ü

 

 

 

 

 

17                   

               MAHBOOB LIAN NEW BUILDING AND REPAIR YARD

 Project Particulars

 

Name of Project

:

MAHBOOB LIAN NEW BUILDING AND REPAIR YARD

Employer

:

MAHBOOB LIAN Ship Building Company

Contractor

:

Takvin Sanaat

Location of implementation

:

Bushehr

Delivery date

:

1394

Cost

:

1,400,000,000,000 Rial

 

 

 

 

 

 

 

 

 

 

 

 

Scope of work of APS for  Engineering Services rendered for the Project

 Eng.

Supervision to Execution

Concep.Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

ü

ü

ü

 

 

 

 

 

 

18

                              Master Plan Of Persian Gulf Network

 

 

 

 

 

 

 

 

 

 

 

 

 Project Particulars

 

Name of Project

:

Master Plan of Persian Gulf Network Including Of Kaveh Port, Road, Railway and Bridge Between Qeshm Island and Main land 

Employer

:

Qeshm Free Zone Organization

Contractor

:

Perto Sahel Tosee Khalij Fars

Location of implementation

:

Qeshm Island - Bandar Abbas

Delivery date

:

1393

Cost

:

694,000,000 Euro

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scope of work of APS for Supervision to EPCF Contract

 Eng.

Supervision to Execution

Concep.Des.

Basic Des.

Detail Des.

M.C.

High Supervision

Site Supervision..

ü

ü

ü

ü

ü

ü